The City of Toronto is launching a study called the High Park Movement Strategy to improve the travel network for High Park and better serve park users and the community. The goal of the study is to improve the travel network to better serve park users and the surrounding community, prioritizing safety and accessibility while preserving the park’s ecological integrity. The study will consider the needs of pedestrians, cyclists, drivers and other users in the park when it comes to mobility.

The study is in early stages and will be underway by the fall 2021. Over the summer, the City will be retaining a consultant team to support the study, finalizing a work plan, collecting data and conducting background analysis. The study is expected to be complete by summer 2022 with implementation of the preferred solution in 2023.

If you enjoy the park and think about how it can improve, please complete this brief survey here: https://s.cotsurvey.chkmkt.com/?e=233567&h=33D6B15564BE93F&l=en

It will ask about your typical park visits prior to the COVID-19 pandemic and about your experiences visiting the park over the past year. It will also ask for your feedback on the current weekend road closures and your thoughts on longer-term changes to the travel network serving High Park.  The survey will remain open throughout the summer.

The survey will be followed by a community consultation in the fall.

We’ve been advised that the Howard Park Tennis Club will be getting a long-overdue service of its own.

Howard Park tennis club is a hidden High Park gem | The Toronto Observer

The City will be undertaking construction and repairs, the scope of work including replacing the existing dilapidated timber retaining wall with a new pre cast stone retaining wall, and replacing the existing unit paver driveway, new concrete steps and handrails. Work is scheduled to commence starting April 5th and is expected to be completed during the summer of 2021. Sounds like match point to us.

For a map of the location of the work, please visit our Councillor’s website.

We all know that High Park is a busy destination, especially now. In an effort to ease access and as part of the City’s ActiveTO projects, the park will be closed to vehicles on weekends (Friday nights to Monday mornings) to allow people to enjoy more outdoor space while being able to practice safe physical distancing. Bicycles are permitted.

There will also be updates to water filling stations and washrooms, as per this link.

High Park | Planet Traveler

An important meeting will be taking place at which the City’s moves to limit the proposed 7-towers in the area north of nearby High Park will be outlined. Here are the details:

Thursday, November 8th, 7-9pm
Grenadier Retirement Residence (2100 Bloor Street West)

Shahrzad Davoudi, an urban designer who participated in the Character Study Working Group will outline the City’s High Park Apartment Neighbourhood Area Urban Design Guidelines and provide an update on the developers’ attempts to challenge those guidelines at the OMB.

There will be a discussion on what would be allowed under those limits, and what the community would want included in counter-proposals from the High Park Community Alliance based on the priorities and needs of local residents. Outgoing Councillor Sarah Doucette, who has been instrumental in fighting for these limits, will also attend. The meeting will be used to honour Sarah for her contributions. The newly-elected Ward 14 Councillor, Gord Perks, has also been invited to attend.